Technical Display Ltd 44 Sansome Place Worcester WR1 1UA
Tel : 0800 169 1779
Holy Trinity Church
Technical Display were asked by the church leaders, to provide an audio visual solution to bring the church services into the 21st century!
Endress+Hauser PC Training Room, Large Conference Room & Digital Signage Solution
Endress+Hauser moved offices to a brand new purpose built building for their Manchester Sales Centre.
Technical Display were asked to provide a solution for a PC Training Room, a large Conference/Meeting room and a Digital Signage Solution for the Reception and Canteen Areas.
Solihull MBC AV Presentation Installation
Technical Display won a competitive tender to design, specify and install an Audio Visual presentation solution for two Committee Rooms.
Solihull had a basic specification for their needs and Technical Display shared their experience to assist them in developing this to achieve a simple to use highly functional solution for both rooms.
Rossendale Borough Council wireless discussion and AV presentation system
Technical Display Systems Ltd won a competitive tender to design and supply a 40 person, Bosch DCN Wireless Discussion System. The system is designed to be portable so that they can take up to 30 units to meetings at rural locations within the borough when needed.
YKK UK Ltd Boardroom / Presentation suite installation
Technical display have installed an integrated Audio Visual sytem for a multi-media presentation facility for their Boardroom/Client Presentation Room.
Training/presentation room installation
Technical display installed a system across two rooms which had to be easy to operate as the rooms are to be used by multiple users for in-house and external client training/presentation applications.
Entertaining at Home
Technical display was commissioned to design and install a Home multi-media audio visual entertainment system which included controllable multi-room HD TV and theatre speaker system including wirless multi room music system.
Newcastle-U-Lyme : 78 Seat Council Chamber
It was decided to refurbish the early 1960's Council Chamber to provide a modern functional meeting facility. The work was to be completed within a six week period over August and September 2005.
Adjacent Committee Rooms were to be refurbished at the same time.